By svc-ewscms, 16 May, 2025
Pictured above is the 271 Pit Viper rental drill. Yesterday, Terry Crane and Epiroc rigged, pinned, and lowered the tower onto the drill and are working on connecting hydraulic lines. This rental drill is an integral part of our future Mine plan.
By svc-ewscms, 16 May, 2025
Climax Safety Success! Addition of a PPE vending machine at the PDWTP. Thank you Rickie Gonzales and Climax SPPAT!
By svc-ewscms, 16 May, 2025
Vanessa DeViterbo and Matt Main lead the Mine Maintenance Safety Stand Down today. The participation from the group was very much appreciated and will benefit the department and the Mine moving forward.
By svc-ewscms, 16 May, 2025
The UT testing on the haul truck 106 frame is complete. Great collaboration between Henderson and Climax to get this testing done. We would like to thank Ryan Poole, Wes Bond, Zorig Boldbaatar, and Eric Benson.
By svc-ewscms, 16 May, 2025
Get plugged into Project Eat That and help Bagdad reach our Big 4 goals.
By svc-ewscms, 16 May, 2025
The Fort Madison 2022 Empowerment Campaign is off to an amazing start! Check out the swag Cory Dewees, one of our Industrial Diagnostic Electricians was awarded! Cory was nominated for demonstrated eagerness and motivation on a project he is assisting our Engineering depart with out in the Acid Plant. Way to go Cory! You have been Empowered!
By svc-ewscms, 16 May, 2025
Climax held its first post-pandemic All Hands meeting on 5/12!  Thanks to the 80+ employees who attended, and thanks to Vicki Seppala for presenting and answering employee questions.  If you missed this one, you have the opportunity to attend on 5/13, 5/16, or 5/19 at 6:30am in the auditorium.  All Hands meetings occur on a quarterly basis following FCX’s company quarterly results  presentation.